The Deckhand newsletter · Issue 2 · Energy Street

Jack-up site-specific analysis

Prepared: Analyst Deckhand (AI assistant) · Checked: Editor Deckhand · Approved: Vamsee Achanta · 3 November 2026

On 24 October 2026, a jack-up drilling unit sank offshore Gabon. Of the 115 people on board, 110 were accounted for and brought ashore [1, 2]. Press reports of the dead and missing differ and await official confirmation [1, 2]. Our thoughts are with everyone affected, and with their families and colleagues.

Gabon's Ministry of Petroleum and Gas has ordered a technical investigation [1, 2]. The rig owner, Borr Drilling, said on 25 October 2026 that "preliminary information indicates that the rig experienced a punch through event during preload activities" [18]. The investigation's findings are awaited. Apart from the rig owner's statement, nothing in this piece bears on the cause of the loss. This piece is to demonstrate and progress complex engineering methods and workflows. We would like to use this opportunity to develop reusable engineering for the jack-up and the liftboat, in a bid to learn and also to help with future site studies for similar structures.

1 Public facts on the loss offshore Gabon

Each statement on the loss is entered in a register with its source and date (Table 1). The register is checked against its sources again on the day the page is published.

IdStatementSource
F1A jack-up drilling unit sank offshore Gabon on 24 October 2026.[1], [2]
F2115 people were on board; 110 were accounted for and brought ashore.[1], [2]
F3Press reports of the dead and missing differ (World Oil, citing Reuters; Marine Insight, citing the Gabonese authorities) and await official confirmation.[1], [2]
F4The Ministry of Petroleum and Gas ordered a technical investigation, to determine the circumstances of the sinking.[1], [2]
F5The rig owner, Borr Drilling, said on 25 October 2026 that "preliminary information indicates that the rig experienced a punch through event during preload activities".[18]

Table 1 - Public facts register for the loss offshore Gabon. Sources dated 25 and 28 October 2026, read again on 3 November 2026; [18] read on 4 November 2026.

Figure 1 shows where the loss happened, as reported. No position has been published, so the whole country is shaded.

Figure 1 - October 2026, offshore Gabon (location as reported; cause under investigation) [1, 2].

The sections below use no data from this loss. They apply to any jack-up or liftboat at any site.

2 Jack-ups, liftboats and wind installation jack-ups all stand on legs

A drilling contractor's annual report counts 494 jack-ups in the global fleet at the end of 2025 [9]. On 1 August 2022, 77 US-flagged liftboats were in active service [10]. We found no public world count of liftboats or of wind installation jack-ups.

The three types of unit work in the same way:

3 Serious jack-up and liftboat accidents, 1999 to 2022: 35 events in three public sources

Liftboats and wind installation jack-ups have an accident record like that of drilling jack-ups. A 2019 review of self-elevating platform incidents finds liftboat incidents "identical to Jack-up incidents" [12]. For wind installation jack-ups, the 2010 MMS report states: "Much can be anticipated about incidents and accidents by looking at the track record of jack-ups in the North Sea and liftboats in Gulf of Mexico" [13].

Figure 2 shows all 35 serious accidents in three public sources, by year and initiating hazard [10, 13 to 17]. The MMS report lists 14 accidents of jack-up construction vessels (construction jack-ups below), mostly at wind farms, from 1999 to 2008. The 2021 review lists 17 of the worst drilling jack-up accidents from 2012 to mid-2021. Four NTSB reports cover one liftboat each.

By our count of Table 2, 17 events are on drilling jack-ups, 13 on construction jack-ups and 5 on liftboats. By our hazard grouping (Note 1), 4 start with storm or weather, 11 with punch-through or foundation, and 4 with leg, jacking or structural failure. Another 4 happen in transit or tow, and 12 are other or not stated.

Figure 2 - Serious accidents of jack-ups and liftboats in three public sources, 1999 to 2022, by year and initiating hazard, or counted by hazard. Filled markers: NTSB investigation reports. Open markers: compiled lists, not investigations. They are the MMS report, compiled from an industry database with some rows quoting press, and the 2021 review, from DNV's WREC accident database. Markers of the same year and hazard are set apart vertically. Data: jackup-accidents.csv (Table 2).

Note 1: the hazard groups are ours. An event under tow or in transport is transit or tow. Other events follow the source's cause code or wording; where the source states no hazard, the event is other or not stated.

Each source covers its own scope and period, so the chart dates these events; the rates below come from the 2021 review. Over a longer span, that review counts 90 liftboat losses, with 56 deaths [14]. It puts the liftboat loss rate at 2 to 3 times that of drilling jack-ups [14]. On jack-ups, deaths per operating rig-year fell from 0.07 to 0.007 over 61 years of records [14].

Table 2 - the 35 accidents behind Figures 2 and 3, with the source of each
YearUnitUnit typeLocationWhat happened (source wording, shortened)Initiating hazard (our grouping)Source
1999Aarsleff Jackconstruction jack-upHorns Rev, Denmark (wind-farm centroid)Overturnedother or not statedCompiled list: MMS report, Table 1 [13]
2000Wijslift 6construction jack-upBlyth, UK (wind-farm centroid)Hull droppedother or not statedCompiled list: MMS report, Table 1 [13]
2003Excalibur (ex Wijslift 6)construction jack-upNorth Hoyle, UK (wind-farm centroid)Broken legleg, jacking or structural failureCompiled list: MMS report, Table 1 [13]
2003MEG-JB1construction jack-upNorth Hoyle, UK (wind-farm centroid)Crane collapseother or not statedCompiled list: MMS report, Table 1 [13]
2003Skate IIconstruction jack-upGunfleet, UK (wind-farm centroid)Punch-through: hull droppedpunch-through or foundationCompiled list: MMS report, Table 1 [13]
2004Skate IIIconstruction jack-upBrighton, UK (town anchor)Wreckedother or not statedCompiled list: MMS report, Table 1 [13]
2005A2Sea Ocean Ady (now Sea Energy)construction jack-upScroby Sands, UK (wind-farm centroid)Leg damageleg, jacking or structural failureCompiled list: MMS report, Table 1 [13]
2006Octopusconstruction jack-upOrkney, UK (islands anchor)Ran aground during towtransit or towCompiled list: MMS report, Table 1 [13]
2007JB-104construction jack-upMilford Haven, UK (town anchor)Capsize, 1 fatality; alongside the dock, not in wind farm serviceother or not statedCompiled list: MMS report, Table 1 [13]
2007Smit Lisaconstruction jack-upRobin Rigg, Solway Firth, UK (wind-farm centroid)Punch-through: hull droppedpunch-through or foundationCompiled list: MMS report, Table 1 [13]
2008Dredging bargeconstruction jack-upMallorca, Spain (island anchor)Abandon ship by helicopter operationsother or not statedCompiled list: MMS report, Table 1 [13]
2008Jakupconstruction jack-upTeesside, UK (town anchor)Wreckedother or not statedCompiled list: MMS report, Table 1 [13]
2008Russell W. Petersonliftboatabout 14 miles off Rehoboth Beach, Delaware, USA (town anchor)Wrecked, 1 fatality, in a May 2008 nor'easter (press quoted in the report)storm or weatherCompiled list: MMS report, Table 1 [13], quoting press; US Coast Guard report not found
2008Titan 1construction jack-upAtlantic (position not public)Lost overboard from a heavy lift vesseltransit or towCompiled list: MMS report, Table 1 [13]
2011Trinity IIliftboatBay of Campeche, about 15 miles offshore, north of Frontera, Mexico, 84 ft water (position estimated from the NTSB text)Elevated in hurricane-force conditions; stern jacking leg failed, vessel listed; 4 diedstorm or weatherNTSB investigation report NTSB/MAR-13/01 [15]
2012Hercules 2502drilling jack-upGulf of Mexico (position not public)Under tow: mat badly damaged by poor cribbing alignment on the barge for a dry tow; rig retired, declared a total loss in 2019transit or towPublished review: 2021 review, Appendix A [14]; cause code S (structural)
2013Hercules 265drilling jack-upSouth Timbalier 220, Gulf of Mexico (position not public)Gas blowout; fire in derrick; beams supporting derrick and rig floor collapsedother or not statedPublished review: 2021 review, Appendix A [14]; cause code O (blowout)
2013Perro Negro 6drilling jack-upCongo River mouth, Angola, 40 m water (anchor: Soyo town)Capsized after punch-through, with 103 on boardpunch-through or foundationPublished review: 2021 review, Appendix A [14]; cause code B (punch-through)
2013Trident 15drilling jack-upMoragot 19, Thailand (position not public)Port leg punch-through giving 7° list; many braces damagedpunch-through or foundationPublished review: 2021 review, Appendix A [14]; cause code B (punch-through)
2014Aquamarine Driller 5drilling jack-upoff Miri, Sarawak, Malaysia (anchor: Miri town)Serious punch-through (plus possible heavy-weather damage under tow)punch-through or foundationPublished review: 2021 review, Appendix A [14]; cause code B (punch-through)
2014Ensco 104drilling jack-upMalaysia (position not public)2 crew killed when a lifeboat fell 150 ft to the sea during maintenanceother or not statedPublished review: 2021 review, Appendix A [14]; cause code N (falling object)
2014Menadrill 1drilling jack-upAkal field, Gulf of Mexico (anchor: Cantarell field)Fire in shale shakers or motor generator roomother or not statedPublished review: 2021 review, Appendix A [14]; cause code F (fire)
2014Rowan Louisianadrilling jack-upVermilion 366, Gulf of Mexico (position not public)Well control problem during wiper trip; all non-essential crew evacuatedother or not statedPublished review: 2021 review, Appendix A [14]; cause code O (blowout)
2015COSLGiftdrilling jack-upSouth-east Asia (position not public)Serious punch-throughpunch-through or foundationPublished review: 2021 review, Appendix A [14]; cause code B (punch-through)
2015Rigmar 152drilling jack-upSouth Atlantic (position not public)Sank under tow from Brazil to Gabontransit or towPublished review: 2021 review, Appendix A [14]; cause code K (flooding)
2015Rumailahdrilling jack-upAl Shaheen field, Qatar (field centroid)Punch-through; 3 legs brokenpunch-through or foundationPublished review: 2021 review, Appendix A [14]; cause code B (punch-through)
2015Troll Solutiondrilling jack-upCaan Alfa well, Gulf of Mexico (anchor: Cantarell field)Probable punch-through and tilt when positioning for maintenance on a wellpunch-through or foundationPublished review: 2021 review, Appendix A [14]; cause code B (punch-through)
2016SAR 201drilling jack-upbeside Safaniya platform, Saudi Arabia (field centroid)Punch-through (or jack failure) on port leg; deck at port stern dropped to nearly sea level; evacuated; 3 missingpunch-through or foundationPublished review: 2021 review, Appendix A [14]; cause code B/M (punch-through or jacking system)
2017Maersk Interceptordrilling jack-upTambar field, Norway (field anchor)Sling lifting a pump broke; 2 drilling staff injured, 1 then went overboard, was recovered and diedother or not statedPublished review: 2021 review, Appendix A [14]; cause code L (lifting)
2017West Titaniadrilling jack-upManick 100-1A, Gulf of Mexico (position not public)Jacking system failure; trim by stern and slight list; flooding of starboard stern main deckleg, jacking or structural failurePublished review: 2021 review, Appendix A [14]; cause code M (jacking system)
2018KS Java Stardrilling jack-upnext to Camar Seagull jacket, SE of Bawean Island, Indonesia (anchor: Bawean)Rapid penetration of starboard leg when preloading; gas well fire on adjacent platformleg, jacking or structural failurePublished review: 2021 review, Appendix A [14]; cause code M (jacking system)
2019Kristin FayeliftboatMain Pass Block 64, about 18 nm east of Venice, Louisiana, USA, 35 ft waterElevated liftboat overturned in under a minute after a crane boom was raised; NTSB: punch-through of one of three legspunch-through or foundationNTSB investigation report NTSB MAB-20/36 [16]
2021SEACOR Powerliftboatabout 7 nm off Port Fourchon, Louisiana, USA, about 50 ft waterCapsized while under way in a severe thunderstorm; 13 diedstorm or weatherNTSB investigation report NTSB MIR-22/26 [10]
2021Velesto Naga 7drilling jack-upSalam-3 well, offshore Sarawak, Malaysia (anchor: Miri town)Punch-through; fully submergedpunch-through or foundationPublished review: 2021 review, Appendix A [14]; cause code B (punch-through)
2022L/B Robertliftboat80 nm SE of Lake Charles, Louisiana, USA, 217 ft waterUnmanned and elevated: gale winds and waves above the air gap moved the vessel; a leg slid into an adjacent can hole; vessel tiltedstorm or weatherNTSB investigation report NTSB MIR-23-28 [17]

Table 2 - Serious jack-up and liftboat accidents in three public sources, 1999 to 2022, with the source of each. Locations in brackets give the reference point used on the map in Figure 3.

4 Past accidents on the map: 26 of the 35 events

Figure 3 places the 26 accidents with a public reference position on a world map. They lie off northern Europe and Mallorca, the United States and Mexico, West Africa, Qatar and Saudi Arabia, and South-east Asia. The other 9 have no public position; Table 2 gives only a sea area, country, field, lease block or well for them.

Figure 3 - Locations of the past accidents of Figure 2, by unit type. NTSB positions are those of its reports. Other markers are reference points for the named field, wind farm, island or town; the Trinity II marker is estimated from the NTSB text. Drag to pan; scroll or pinch to zoom. Data: jackup-accidents.csv.

5 What a site-specific assessment covers

Before a jack-up works at a new location, a site-specific assessment checks the unit at that location [3, 4]. The assessment covers:

In US federal waters, Title 30 of the US Code of Federal Regulations (30 CFR) covers the use of a MODU in section 250.713 [5]. Under 250.713(a), the operator must show the unit's capability at the proposed location, including the minimum air gap. Under 250.713(b), the operator must also show that the site-specific soil and oceanographic conditions can support a bottom-founded unit, one that stands on the seabed [5].

For a liftboat, we apply the foundation, structure and air gap checks as for a jack-up. Its overturning check must also meet the US Coast Guard's special rules for liftboats, sections 174.240 to 174.260 of Title 46 of the CFR [8]. For a liftboat in restricted service, 46 CFR 174.255(c) sets on-bottom stability: a continuous downward force on each footing under waves, currents and 70-knot winds in normal operation, and 100-knot winds in a severe storm [8]. The same sections set its stability afloat and its freeboard [8].

6 Site and unit data

A site study needs two groups of data: data on the site and data on the unit (Table 3).

Data groupWhat the study needsPublic sources
Water depth and seabedWater depth at each leg position; a seabed survey for obstructions and debrisRegional bathymetry (charted water depths), for example the GEBCO grid (General Bathymetric Chart of the Oceans); the site survey is held by the operator
SoilBorings or cone penetration tests at the location, with the soil strength with depthRarely public; held by the operator or its survey contractor
MetoceanWind, waves, current and water level for the assessment storm, and for the weather windows of a moveBuoy records, for example the NOAA National Data Buoy Center; hindcasts (model reconstructions of past weather), for example ERA5
UnitLeg and hull geometry, spudcan size, weights, the capacity of the holding system, and the stability bookletRig data sheets and classification society records, in part; the full data are held by the rig owner

Table 3 - Data for a jack-up or liftboat site study, and where public sources exist.

7 How the methods serve future site studies

Try it out: for your next jack-up or liftboat move, list each input to the site assessment with its source and date.

This piece leaves open which checks of a jack-up site study need changes before they apply to a liftboat.

Reusable prompts

Set out a site-specific assessment of a jack-up or liftboat at a new location: list the site and unit data it needs (Table 3), set out each check of section 5 with the edition and clause of each code it uses, and mark every input with its source. Then count the jack-ups and liftboats in service from public operator filings and investigation reports. Chart past serious accidents of all kinds by year, initiating hazard and unit type, and on a world map, each with its source. Name no cause for any event still under investigation.

Data: the public data sets for each input, such as the GEBCO grid, the NOAA National Data Buoy Center records and ERA5, are named in Table 3. The accident data set behind Figures 2 and 3 is jackup-accidents.csv. It holds 35 public events, each with year, unit type, location, position, hazard group and source. The sources are the MMS report, the 2021 review and four NTSB investigation reports [10, 13 to 17]. The fleet counts are from [9] and [10].

Readers are welcome to share their own site study results at support@aceengineer.com.

References

[1] World Oil, citing Reuters, 25 October 2026, news report on the jack-up loss offshore Gabon. [2] Marine Insight, 28 October 2026, news report on the search and rescue offshore Gabon. [3] ISO 19905-1:2023, Site-specific assessment of mobile offshore units, Part 1: Jack-ups. [4] SNAME T&R Bulletin 5-5A, Recommended Practice for Site Specific Assessment of Mobile Jack-Up Units, Rev 3, August 2008. [5] US Code of Federal Regulations, 30 CFR 250.713, "What must I provide if I plan to use a mobile offshore drilling unit (MODU) for well operations?", eCFR, current to 30 October 2026, ecfr.gov. [6] IMO resolution A.1023(26), Code for the construction and equipment of mobile offshore drilling units, 2009 (2009 MODU Code), Chapter 3, stability. [7] 46 CFR 125.160, Definitions, "Liftboat", eCFR, current to 30 October 2026, ecfr.gov. [8] 46 CFR Part 174, Subpart H, Special rules pertaining to liftboats, eCFR, current to 30 October 2026, ecfr.gov.

References [9] to [17] were read on 4 November 2026. [9] Valaris Ltd, Form 10-K for the year 2025, filed 20 February 2026, sec.gov. [10] NTSB, Marine Investigation Report MIR-22/26, capsizing of the liftboat SEACOR Power, adopted 18 October 2022, section 1.1.1, ntsb.gov. [11] NREL, Offshore Wind Market Report: 2024 Edition, NREL/TP-5000-90525, docs.nlr.gov. [12] van der Kraan, "Self Elevating Platform (Incl. Liftboat) Incidents", Jack-up Conference 2019, conference paper. [13] Sharples, "Damage and Critical Analysis of Accidents ... Offshore Wind Farms on the OCS", MMS TA&R Project 633, May 2010, Table 1 and p. 77, bsee.gov. [14] Jack, Hoyle and Hunt, "Jack-up Accident Statistics - Yet Another Update", Jack-up Conference 2021, Appendix A, conference paper. [15] NTSB, Marine Accident Report NTSB/MAR-13/01, liftboat Trinity II, ntsb.gov. [16] NTSB, Marine Accident Brief MAB-20/36, liftboat Kristin Faye, ntsb.gov. [17] NTSB, Marine Investigation Report MIR-23-28, liftboat L/B Robert, ntsb.gov.

[18] Borr Drilling Limited, "Borr Drilling Limited - Prospector 5 Rig Incident", press release, Hamilton, Bermuda, 25 October 2026, distributed by PR Newswire, read 4 November 2026, prnewswire.com; copy at placera.se.