Computational Fatigue Assessment for Offshore Platform

Industry: Oil & Gas | Location: Gulf of Mexico | Duration: 6 weeks

Comprehensive fatigue life assessment for a 40-year-old fixed platform using machine learning to incorporate 15 years of operational monitoring data. Reduced assessment time by 85% while improving prediction accuracy by 23%.

85%
Time Reduction
23%
Accuracy Improvement
$2.1M
Cost Avoided
847
Joints Analyzed
API RP 2A DNV-RP-C203 BSEE Accepted

Read Full Case Study

Automated FEA Post-Processing Pipeline for Subsea Equipment

Industry: Oil & Gas | Client: Subsea Equipment Manufacturer | Duration: 8 weeks

Python automation pipeline for NASTRAN FEA post-processing that eliminated manual data extraction bottlenecks. Reduced post-processing time by 90% and enabled 50+ qualification reports per week with zero manual errors.

90%
Time Reduction
50+
Reports/Week
0
Manual Errors
$340K
Annual Savings
API 17D DNV-OS-F101 ISO 13628

Read Full Case Study

Computational Wind Turbine Foundation Analysis

Industry: Offshore Wind | Location: North Sea | Duration: 8 weeks

Structural integrity assessments for 92 monopile foundations using machine learning-based load prediction and fatigue assessment. Achieved 70% reduction in analysis time and 25% foundation weight optimization through site-specific probabilistic analysis.

70%
Time Reduction
25%
Weight Optimization
4.2M
Load Cycles
92
Foundations
DNV-ST-0126 IEC 61400-3 DNVGL-RP-C203

Read Full Case Study

OrcaFlex Riser Sensitivity Automation

Industry: Oil & Gas | Location: Gulf of Mexico | Duration: 2 weeks

OrcaFlex batch automation reduced Steel Catenary Riser sensitivity analysis from 50 engineer-hours to 4 hours overnight. Delivered 70% cost savings for mid-market engineering firm with complete results in 3 days instead of 3 weeks.

70%
Cost Savings
50
Configurations
4 hrs
Analysis Time
$35K
Project Savings
API RP 2RD DNV-OS-F201 DNV-RP-C203

Read Full Case Study

BSEE Field Economics Analysis with NPV/IRR

Industry: Oil & Gas | Region: Gulf of Mexico | Duration: 3 weeks

Comprehensive field economics analysis using BSEE production data delivered $6.1B NPV calculation with 15% IRR for deepwater development. Automated workflow enabled rapid scenario analysis and sensitivity testing for investment decision support.

$6.1B
NPV (10%)
15%
IRR
32 mo
Payback Period
374
MMbbls Recoverable
BSEE Public Data Industry Standard Economics Auditable Methodology

Read Full Case Study

Marine Safety Incident Correlation Across 7 Authorities

Industry: Maritime | Scope: Global | Duration: 8 weeks

Cross-database incident correlation system integrating 7 maritime authorities (MAIB, TSB, USCG, NTSB, ATSB, IMO, EMSA) using fuzzy matching and intelligent deduplication. Delivered 92% reduction in manual correlation time with automated cross-reference of 53K+ incidents.

7
Maritime Authorities
53K+
Incidents
92%
Time Reduction
2,300+
Cross-Links Found
Public Maritime Data Fuzzy Matching Auditable Deduplication

Read Full Case Study

Pipeline On-Bottom Stability Assessment -- Deepwater Gulf of Mexico

Industry: Oil & Gas | Location: Gulf of Mexico | Standard: DNV-RP-F109

Automated on-bottom stability assessment for a 12 km deepwater export pipeline across 48 environmental load cases. Reduced assessment time by 60% and identified 3 critical spans requiring remediation that manual spot-checks had missed.

60%
Time Reduction
12 km
Pipeline Length
48
Load Cases
3
Critical Spans Found
DNV-RP-F109 DNV-ST-F101

Read Full Case Study

Multi-Code Wall Thickness Comparison -- Subsea Flowline Design

Industry: Oil & Gas | Application: Subsea Flowline | Standards: ASME B31.4, API 1111, DNV-ST-F101

Simultaneous wall thickness design across three international codes for a deepwater flowline project. Automated comparison identified code-specific governing conditions per pipe size, reducing design time by 40% and enabling $1.2M material cost savings through optimal thickness selection.

3
Codes Compared
40%
Design Time Reduction
$1.2M
Material Savings
5
Pipe Sizes
ASME B31.4 API 1111 DNV-ST-F101

Read Full Case Study

Tank Sloshing CFD Reports

Methods: Multiphase CFD, analytical sloshing theory, mesh and timestep verification

Explore the reviewed free-decay and forced-roll loading conditions in a case-by-case report, or compare all accepted response and theory curves in the configurable summary.

Open Sloshing Capability Browse All Cases Open Validation Fixture Open Individual CFD Report Open Sloshing Summary Open CFD QA Analysis


More Case Studies Coming Soon

We're documenting additional projects across these areas:

Discuss Your Project View Our Services