Engineering Demos & Outreach Resources
Five overnight parametric installation engineering demos, two contractor-targeted briefs, and a 1-page capability summary. Everything below is meant to be sent directly to a prospective client.
Briefs by audience
Pick the brief that matches your audience and pair with one or two of the demos below.
Heavy-lift, pipelay, PLSV, FOWT-installation
1-screen brief on installation engineering screening, operability envelopes, and contractor-specific tooling. Built for procurement & engineering managers.
For floating offshore windFOWT mooring screening — OC4 worked example
Pre-FEED / early-FEED mooring concept screening on the OC4-DeepCwind public reference. Explicit screening-tier scope; no IEC over-claim.
For small & marginal operatorsStripper wells — card diagnosis, field triage, keep-or-plug economics
Onshore rod lift. Dynamometer cards read on plunger stroke, field ranked by health, and the keep/workover/shut-in/plug decision priced with the plugging liability carried in every case.
Demos to attach
Each demo is one parametric overnight run with a 30-second walkthrough GIF embedded. Send the URL directly or paste the GIF into a follow-up.
DNV freespan / VIV screening
680 parametric cases across 3 pipe sizes & rigid jumpers. DNV-RP-F105 simplified VIV with seabed-gap correction.
Demo 2 · pipeline designPipeline wall thickness — multi-code
72 parametric cases under ASME B31.4/B31.8, DNV-OS-F101, API 1111 simultaneously. Conservative governing-code ranking.
Demo 3 · subsea installationDeepwater mudmat installation
180 cases across vessel RAO, sea state, mudmat geometry. DNV H103 coupled with OrcaFlex screening.
Demo 4 · marine operationsShallow water pipelay
60 parametric cases. Vessel-RAO and sag-bend tension sensitivity across the sea-state envelope.
Demo 5 · subsea installationSubsea jumper lift — Ballymore
Manifold-to-PLET jumper. 27 OrcaFlex line sections auto-generated; 81/81 validated tests.
Demo 6 · station-keeping (template)Mooring & station-keeping screening
Catenary, taut, and hybrid mooring concept screening. Quasi-static stiffness and frequency-domain response trends. Page values are illustrative public-reference until a project run is commissioned.
One-page capability summary
The shortest answer to "what does AceEngineer do?" — one page, sendable as an attachment.
Download Capability Summary (PDF, 1 page)Talk to us
To start a parametric run on your data, email the vessel or structure type, the location, and one or two design questions. The canonical models are already built, so the work goes into the run, not the setup.